WNG Suspended Central Drive Sludge Thickener Scraper
Working Principle & Construction
The WNG series suspended central drive scraper is composed of vertical reducer with motor, external-tooth slewing bearing, main shaft, scraper arm,scraping blade, concentration fence, flow stabilizer and control cabinet.
Driven by the drive unit, scraper arms revolve around tank central axis. The scraping blades fitted on arms push settled sludge from tank periphery inward into central sludge pit.
When overload happens caused by foreign matter jamming or excessive sludge accumulation, the overload protection unit will cut off power, trigger audible visual alarm and stop machine once torque reaches preset value to safeguard equipment.
Specification
Model |
WNG4 |
WNG5 |
WNG6 |
WNG7 |
WNG8 |
WNG9 |
WNG10 |
WNG12 |
WNG14 |
WNG16 |
Tank Diameter D1 (m) |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
12 |
14 |
16 |
Scraper Arm Circle D2 (m) |
3.6 |
4.6 |
5.6 |
6.6 |
7.6 |
8.6 |
9.6 |
11.6 |
13.6 |
15.6 |
Tank Side Depth h1 (m) |
3 |
3.6 |
4 |
4.4 |
4.8 |
|||||
Sludge Pit Height h2 (m) |
0.5 |
0.6 |
||||||||
Upper Dia.of Sludge Pit D3(m) |
1.2 |
1.5 |
2 |
|||||||
Pre-embedded Plate Inner Dia ΦA(mm) |
550 |
650 |
||||||||
Bolt Circle Dia ΦB(mm) |
700 |
950 |
||||||||
Pre-embedded Plate Outer Dia ΦC(mm) |
900 |
1100 |
||||||||
Min.Working Bridge Width Fmin(mm) |
≥1000 |
≥1200 |
||||||||
Tip Line Speed of Blade(m/min) |
1~3 |
|||||||||
Motor Power(kW) |
0.37~0.55 |
|||||||||
Features
Few transmission links, high mechanical efficiency and compact overall structure.
Optional overload protection device: automatic alarm and shutdown when torque exceeds rated setpoint for secure operation.
High-rigidity tubular main shaft; no bearing installed at tank bottom, eliminating tough underwater maintenance
work under harsh tank bottom environment.
Electrical Control
Start-stop and running duration can be customized as customer requirement; PLC communication interface is
available.
Product Naming Convention


Inquiry Instruction
1.Specify if effluent weir plate is required.
2.Clarify requirements on material grade, anti-corrosion treatment, motor and reducer.
3.Steel service bridge can be supplied optionally.
4.Provide tank civil construction drawing with detailed dimension when placing order.