Leave Your Message

The installation and use of submersible thrusters must strictly follow the specifications.

2026-02-07

I. Pre-Installation Preparation

Environmental Inspection

Confirm that the pool depth and liquid level meet design requirements to ensure the equipment can operate submerged.

Clean the bottom of the pool of sharp debris and sludge deposits to prevent impeller damage or blockage of water flow channels.

Check the accuracy of the embedded parts' positions and dimensions. Drill holes and secure the support structure (e.g., M16 bolts).

Equipment Inspection

Inspect the main unit, guide rod, impeller, and other components for damage and ensure fasteners are not loose.

Manually rotate the impeller to confirm it rotates freely without jamming.

Measure the motor's insulation resistance to ensure it is not less than 5 megohms to prevent leakage risk.

Electrical Confirmation

Check that the power supply voltage matches the equipment's rated voltage, that the cables are undamaged, and that wiring is correct and grounding is reliable.

Confirm that the control system wiring is correct and the overload protection settings are appropriate.

II. Key Points of Installation

**Guide Rod and Bracket Installation**

The guide rod must be installed vertically. A plumb bob can be used for correction; the deviation should be less than 10mm to ensure smooth lifting and lowering of the impeller.

Install the upper lifting frame, lower support, and limiting bracket, and secure them firmly by welding or using chemical bolts.

**Main Unit Lifting**

Use a hand-cranked winch or crane, lifting with slings. Direct lifting with cables is strictly prohibited.

During lifting, the impeller end should be tilted upwards at a 5°–10° angle to avoid collision with the pool wall.

Slowly lower the main unit along the guide rod, keeping the center of gravity and the lifting point on the same vertical line to prevent jamming.

**Impeller and Angle Adjustment**

Install the impeller tip facing outwards, at a distance of ≥350mm from the pool bottom and ≥0.7 times the impeller diameter from the liquid surface.

Adjust the impeller direction to be consistent with the water flow direction to avoid creating eddies when placed on the inlet/outlet side.

Install the positioning pin to ensure accurate repositioning for subsequent maintenance.

Cable Fixing

Secure the cable to the lifting chain or guide rod using stainless steel clips, leaving sufficient slack to prevent breakage.

Tighten the waterproof connectors to ensure a good seal and prevent water from seeping into the motor.

III. Start-up and Commissioning Procedures

Jig Test

Before initial startup, perform a jig test to observe if the impeller rotation direction is correct (usually clockwise when viewed from the impeller end).

If the direction is incorrect, disconnect the power, reverse the phase sequence, and try again.

No-Load Test Run

After successful jig test, run the equipment under no-load for 30 seconds, checking for vibration, noise, or jamming.

The operating current should be normal, with no overload.

Formal Operation

After closing the circuit breaker, continuously monitor the equipment's operating status, recording parameters such as current, temperature, and vibration.

Continuously run the equipment for 4–8 hours to confirm uniform flow and no leakage.

IV. Precautions During Use

Dry Operation is Strictly Prohibited: The equipment must be completely submerged in water, and the dry operation time must not exceed 30 seconds.

Avoid frequent start-stop cycles: Prevent motor overload and mechanical shock.

Observe the liquid level trajectory: If abnormal eddies or turbulent flow occur, adjust the position or angle promptly.

Winter antifreeze: For prolonged shutdowns, drain all water from the pump to prevent freezing and cracking.

V. Daily Maintenance and Care

Regular Inspection

Monthly, lift and inspect the impeller for cracks, deformation, or entanglement; clean promptly.

Check the lubricating oil condition in the oil chamber. Change the oil after 3 months of operation for new equipment, and then every 6 months thereafter.

If the oil is emulsified, it indicates seal failure; the mechanical seal needs to be inspected or replaced.

Seal Maintenance

The packing seal should be slightly dripping water, neither too tight nor too loose; the end-face mechanical seal must be filled with liquid before starting to prevent dry friction.

High-temperature media (≥100℃) require a flushing and cooling system.

Safe Operation

Power must be disconnected before maintenance, and a "Do Not Operate" warning sign must be displayed.

Use insulated tools and protective equipment to ensure personnel safety.

Record Management

Establish a maintenance log to record each inspection, repair, oil change, etc., to facilitate tracking of equipment status.